
Correctional Facility
Reduced Water Heating System from 6 Million BTU’s to 2 Million BTU’s at 96% Operating Efficiency. Projected savings of 40% and up.
Correctional Facility
Reduced Water Heating System from 6 Million BTU’s to 2 Million BTU’s at 96% Operating Efficiency. Projected savings of 40% and up.