Replacement of Atmospheric Boilers Phase 2 – Correctional Facility

  • Existing boilers – 990,000 BTU 15 Years+ old
  • Replaced with CW 750
  • Operational Savings Projection – 20%
  • Reduction in BTU Size – 15%